Jira/Greenhopper能做次级项目? 我想有两个主要项目:A和B,然后是A1、A2、A3和B1、B2、B3。 这对于维持秩序至关重要。 我和所有业务小组一样,都属于一个业务项目,所有机动小组都属于一个流动小组项目,等等。
I m looking at using the Hudson JIRA plugin to post a JIRA comment on each build. The SCM I m using is perforce which is already linked to the JIRA tasks using perforce jobs. I can see that the JIRA ...