我对欧洲统计局(Evidence based Scheduling)有一个FogBugz问题。
“A”号案(X)和B号开发商在A号开发商可以开始之前和时间之前完成A号案。 如果B开发商同意A开发商所输入的同一估计数,那么我们如何能够将这一估计数转给B开发商,用于基于证据的时间安排?
(我希望避免B开发商将估计数转至Y,然后回X)
我对欧洲统计局(Evidence based Scheduling)有一个FogBugz问题。
“A”号案(X)和B号开发商在A号开发商可以开始之前和时间之前完成A号案。 如果B开发商同意A开发商所输入的同一估计数,那么我们如何能够将这一估计数转给B开发商,用于基于证据的时间安排?
(我希望避免B开发商将估计数转至Y,然后回X)
根据:
(2) ——你打了它,现在唯一的工作方向(除了写一张假象,在工作开始时自动把估算器转换到目前的寄给人)是把估算转换到Y,然后回到X,或者开发商B对估计数作一分钟的改动,使其自己。 索里,我知道这并非理想。 - Brett Kiefer
I m looking for a simple solution for support case management. The final nominees are Fogbugz and the open source OTRS.
In our FB configuration a new case is category = "Bug" per default. I would like to change that to "Inquiry". How to do that?
I want to get all the history of a case. Is this possible through the api?
For example, search for editedBy:<USER> madeChange:"changed estimate field" (possibly: editedOn:Yesterday). Is this possible?
I have built a php script which receives values in $_POST and $_FILES I m catching those values, and then trying to use CURL to make posts to FogBugz. I can get text fields to work, but not files. ...
I m starting a project in Visual Studio 2010 and I d like to use FogBugz in conjunction with it, but the addin supplied appears to be for VS 2008. Is there a version that works with 2010? [crosses ...
I am using Fogbugz as my Bug tracking software, and was thinking on a schedule so that I can upgrade my Bug tracking software once in a while according to that schedule. I was just curious on how ...
Our company have recently upgraded our FogBugz installation to version 7, downloaded the latest post-commit files, and followed the latest instructions on integrating SVN with FogBugz (to get lists of ...